Jianghai Company Zhangjiagang Grain and Oil Industrial Park New Steel Board Warehouse Project Project Second Trial Invitation Letter
Release time: 2024-06-27 15:25:53

Jiangsu Province Food Group Co., Ltd. (hereinafter referred to as & ldquo; seabet online sports bettingProvincial Grain Group & RDQUO;) The audit agency of the plan to participate in Jianghai Company Zhangjiagang Grain and Oil Industrial Park New Steel Board Warehouse Project Engineering,Now invited your company to conduct audit work expenses。
I. Project Overview
1. Project name
Jianghai Company Zhangjiagang Grain and Oil Industrial Park New Steel Board Warehouse Project.
2. Introduction to the project
(1) Project location: Zhangjiaga, Grain and Oil, Zhangjiagang Industrial Park, No. 1, Baodao Road, Jinang Town, Zhangjiagang City。
(2) Project construction content: 60,000 tons of steel plate warehouse,Improve the tower,Trestle bridge and outdoor engineering。
(3) Total investment of the project: preliminary design budget is 10,35.542 million yuan。
3. Work content
(1) The basis for review and settlement of review: review completion settlement preparation basis whether it complies with relevant national regulations,Whether the information is complete,Is the procedure complete,Is it compliant with the leftover problem。
(2) The amount of review project: verify the amount of construction project; the amount and price seabet sports bettingdifference of the review of the materials; reviewing the hidden acceptance records; the use of the quota of the review project; the category of reviewing the project; Specific calculation error。
(3) Review project contract: whether the relevant documents are complete、Legal compliance。
(4) Other key concerns.
2. Work requirements
1. The calculation of engineering cost should be ensured during the audit process of engineering settlement,Policy、Regulations to grasp correctly; pay attention to the project project of the project、Design、Approval、Bidding、Construction、Completion of legal、Compliance、Reasonable,Whether the changes in the project have fulfilled the legitimate procedure, etc.; The preliminary review opinions should be explained for the main trial in the preliminary review opinion;。
2. During the audit period of engineering settlement,Auditors of the office must abide by the relevant rules and regulations of the seabet online sports bettingProvincial Grain Group and project units,Obey Management,Completion of engineering settlement audit related work arranged by the provincial grain group。
3, bid requirements
1. Qualification requirements: The bidding unit has an independent legal person qualification (provides a copy of the business license and stamped with the official seal of the unit);
2. Estaters: At least 3 senior service personnel are assigned to the supplier team (3 senior service personnel must meet the following conditions at the same time: A.3 of the senior service personnel is equipped with at least one construction engineering major. Or registered cost engineer for municipal majors,At least one supervisor engineer at the same time; B. 3 senior service personnel must have the title of senior engineer),Experience of the entire process of engineering projects with engineering projects;
3. Performance requirements: Suppliers for nearly 5 years (from January 1, 2019 to the present to the present,The time seabet sports bettingfor signing the contract) shall have 3 or more investment scale to reach the audit experience and complete cases of major investment projects of a major state -owned enterprise;
4. Avoiding requirements: Participate in the compilation of the project bid for the project、Tracking Audit、Settlement agency shall avoid;
5. Integrity requirements: Strictly implement the audit organs & ldquo;,Do not contact Party A and construction units in private;
6. Confidential requirements: Strictly abide by the requirements of confidentiality discipline,Confidential information such as the business secrets of Party A and the construction unit known to be known in the business process,signed a confidential commitment letter;
7. Time limit requirements: The audit time limit is issued within one month after providing audit -related materials within one month。
8. This service fee includesBasic charges and benefits charges,Among them: basic cost standard 30,000,Benefit charging standards are quoted by the bidding unit at the nuclear reduction ratio。The audit service fee is signed and stamped by the project settlement review form (three parties) and the formal report is issued。
    9. The quotation letter shall be attached to the case of other similar project case certification materials、A copy of the professional qualification certificate、Working instructions, etc.。
4. Bid evaluation methods
1. This bid evaluation team consists of relevant personnel of the seabet online sports bettingProvincial Grain Group and Jianghai company。
2. This bid evaluation adopts a comprehensive scoring method,The highest score won the bid。Rules for the scoring rules, please refer to the specification of the bid。
5. Quotation letter submitting requirements
1. Quotation Letter 2 part,Seal with the relevant proof materials in the envelope。
2. The quotation letter Please please before 11:00 am on July 1, 2024,Delivery to Room 2510, Su Grain International Building。
3. Contact: Guan Chao,Contact number: 025-68529971。
 
 
seabet online sports bettingProvincial Grain Group Audit Risk Control Department
June 27, 2024   
 
 
Bid evaluation and details
 
Estimation of points
(total score 100 points)
​​Bid offer:  40  points
Work plan:  40  points
Project leader:  8  points
Project team:  7  points
Service commitment:  3  points
Others:  2  points
Band evaluation base price calculation method This tender,The average amount of the nuclear reduction at the valid quotation is the benchmark price,The benchmark price is the full score of price points,40 points。
seabet online sports betting Scoring factor Score Standards
Bid offer
Score Standards
40) points
Bidding quotation and the benchmark price deviation (maximum deduction 10 points) equal to the standard price of bid evaluation (40) points
Everyone is deducted by one point for a thousandth of the quota reduction ratio of the basis for the basis for the basis of the standard.
0.5 points at a deduction of one -thousandth of the quota nuclear at the basis of the basis for the basis of the bid evaluation
Working plan
(40) points
1. Work plan design complete,Clear thinking,It has operability,Make sure to complete the required time,30-40 points;
2. Work plan design is relatively complete,Thinking is relatively clear,It has certain operability,​​Basically completed within the required time,get 20-30 points;
3. Work plan is not clear,Lack of operating,It cannot be completed within the required time,10-20 points。
Project leader
(8) points
1. With registered cost engineers or senior professional titles,and have 10 years or more experience,up to 8 points;
2. With registered cost engineers or senior professional titles,and has experience with 5 years or more,up to 6 points;
3. Have registered cost engineers or senior professional titles,and have less than 5 years of experience,At most 4 points。
Project team
(7) points
1. Invest 5 people in the core personnel of this project,Depending on its previous work resume,Personnel participating in the nature of the project、scale scoring,up to 7 points;
2. Invest 4 and below of the core personnel of this project,Depending on its previous work resume,Personnel participating in the nature of the project、scale scoring,At most 4 points。
Service commitment
(3) points
The degree of compliance between commitments and seabet clubexpectations,Satisfaction 3 points,General 1-2 points,Dissatisfied 0 points。
Other (2) points Each judge has a comprehensive judgment of the bidding unit 0-2 points.
 